Implementation method
A 28-week implementation, run by the client's team.
Pramaan uses an SAP Activate-aligned sequence: fit-to-standard first, configuration in sprints, and gates that stop the programme from drifting. The scope for the first release is finance and HR: FI, CO, personnel administration, organisational management, time and payroll.
The six gates
Swipe to see all columns →
| Phase | Weeks | Outcome | Gate |
|---|---|---|---|
| 0 · Mobilise | 1–2 | Team, scope, tenant, data profile, decision log | Signed charter and plan |
| 1 · Discover | 3–5 | Fit-to-standard, process baseline, target design | Validated scope baseline |
| 2 · Explore | 6–11 | Blueprint for FI, CO, HR, time and payroll | Signed blueprint |
| 3 · Realize | 12–21 | Configuration, extensions, integrations, data | SIT exit |
| 4 · Deploy | 22–25 | UAT, cutover, parallel payroll | UAT sign-off |
| 5 · Run | 26–28 | Hypercare, handover, benefits baseline | Service acceptance |
Release 1 scope
One scope baseline after Explore. New scope enters through the change board, not a corridor conversation.
FI
General ledger, AP, AR, asset accounting, tax, bank integration
CO
Cost centres, internal orders, WBS, allocations, margin analysis
PA
Personnel administration: employee master, actions, org assignment
OM
Organisational management: units, jobs, positions, reporting line
Time
Work schedules, attendance, absences, overtime, payroll input
Payroll
Indian payroll, statutory deductions, parallel run, postings
Data before cutover
Master data is profiled in week 3, not in the cutover window. Every object has a source, owner and validation rule.
Parallel payroll
At least one full parallel payroll before go-live. The payroll register must tie to the FI/CO postings.
Evidence of readiness
SIT, UAT, cutover rehearsal and a signed service acceptance. No gate is waived for speed.
Take the method with you.
The full guide covers scope, sample master data, configuration sequence, testing, cutover and the first 100 days after go-live.